Which scheduler generates tables and forward to the dispatcher?

Which scheduler generates tables and forward to the dispatcher? Correct Answer static scheduler

The static scheduler generates tables of start times which are forwarded to a simple dispatcher and it can be controlled by a timer which makes the dispatcher analyze the table.
Bissoy MCQ

Related Questions

The main function of the dispatcher (the portion of the process scheduler) is
The primary distinction between the short term scheduler and the long term scheduler is __________