Statistical Process Control for Short Production Runs MCQ
Test your knowledge with important Statistical Process Control for Short Production Runs MCQ and their applications. These MCQs are beneficial for competitive exams too. Explore 30+ more Statistical Process Control for Short Production Runs MCQs on Bissoy. Bissoy App
-
Low type I error probability is obtained when 2-sigma limits are used for modified control chart.
-
2-sigma limits are recommended for the modified control charts. Which of these is not one of the reasons for this?
-
Modified control chart design is not based upon ____________
-
When the values of δ and α are specified instead of the β and γ, what is the position of UCL of the acceptance control charts?
-
When the values of n, δ, and α, are specified, the LCL of the acceptance control charts, lie in between ________
-
How many approaches can be used to develop the acceptance control charts?
-
Which of the error probability does the acceptance control chart take into account?
-
If the process mean increases very much, the modified control charts are not appropriate.
-
The p-chart is the only chart to monitor the fraction of nonconforming units.
-
A modified control charts limit expression does not contain ___________
-
Who was the first person to develop the acceptance control charts?
-
The approach of using a x chart to monitor the fraction of nonconforming units or the fraction of the units exceeding the specifications, is called the ___________
-
From which chart the initial estimate of the process variability is determined?
-
If there is a chance of shifting of the process variability, which chart may be used with the modified control chart?
-
If process variability shifts, the modified control charts are ____________
-
To design a modified control chart, we must have a good estimate of _________ available.
-
Which of the hypothesis can be tested using the modified control charts?
-
____________ sigma limits are recommended for modified control charts.
-
If the Cpk=0.9899, the usage of modified control charts is very necessary.
-
The six-sigma approach when implemented for a long time, the process may need modified control charts.
-
Which of these does not say that the modified control limits must be applied?
-
Which of these is a method used when the process capability is quite high?
-
Which of these is not a name of Modified control limits for x̅ charts?
-
Which of these is used when the process has achieved high capability level?
-
Which of these is not a purpose for which control charts are produced for?
-
Which method was suggested by Del Castillo and Montgomery, to be used instead of the Q-chart to get better ARL performance?
-
Which of these charts can be used instead of Shewhart control charts, in the case of small number of subgroups used to construct the charts, which were recommended by Quesenberry?
-
Who was the first person to study the effect of the number of subgroups used for x bar and R chart control limit calculation on the false alarm rate?
-
The false alarm rate is _______ when small number of subgroups is used for the Shewhart control charts.
-
Which of these is eliminated by the self starting approach?